TASHAN INDUSTRY ZONE
A survey of southern suburbs Tashan
Industry Zone
The southern suburbs Tashan industry zone of Datong (SSTIZD) is located
at the southwest of Datong city.30 kilometers Away form the urban district. Belongs to
Xiwanzhuan VI llage. The district is l inked with Dayong highway. Etc. In the west. And is
close neighbor to beitongpu railway and Daqing railway. The district. With very convenient
communication, even relief and well geology, is an ideal choice for the large industry
zone. The SSTIZD coves 16.795 km2 and investment scale is about RMB 300 billion. Will
become heavy chemical industry zone and an important economic point in the city by relying
mainly on the tashan mine of 1500mt/a and the enrich coal resources in the city.
1.Natural condition
The southern suburbs industry zone of Datong is locatedat39°35'15"~39°56'15"northlatitude
and 13°20'01"~133°00'easlongitude,is1159-1008mabove sea level with abundant
sunshine. The annual average temperature is 5.4Cand the rainfall comes to 419.88mm and the
annual suns hone time is by an average of 2822 hours.
2.Geographical Location
The location of then southern suburbs is very advantage. There are
Jinbao railway, railway. Tongpu railway. Daqing railway and 35 roadways such as Jingda,
Datang Dayongetc. Which is through or intersection in the district. In the northeast there
are Jingbao, Daqing railway line, which are connected with Kouquan railway and Yungang
railway. It is 382km from Datong to Beijing along jing-bao railway.355km to Taiyuan along
Beitongpu railway and 630km to Qinghuangdao along Daqing railway, in the east side of the
zone there are Datong-yuncheng road and Dayun highroad built shortly. Yaerya-Fangzichong
coal roadway, Kouquan-Yuling roadway and Kouquan-Zhangliuzhuang roadway, Kouquan-Huiren
roadway and Datong airport are constructing, the Communication of the zone is very easy to
the outside.
3.capital construction
Power supply
In the zone there are a 220KV Xiwanzhuang substation with a capacity of
120MVA and 110KV Yetong substation with a Capacity of 500MVA,which can meet the
requirement of the power.
Telecommunication
A optical cable from the Datong Coalmines Group Co to the zone will be
erected and can mounted with 5000 trunk-calls. Domestic and international direct-dial
trunk call can put through and telex as well. With these the communication problem can be
solved.
Water supply
The water source of the zone is supplied by 2000~3000t/d water station
and 7000t/d Xiawuozai station of the Datong Coalmines Group Co. can meet the need of the
zone. The. Production water is from Chetian reservoir a capacity of 30000t/d.
Drain
A sewage treatment plant will be built in the zone to make the living
sewage reach the standard. Heat source the comes from surplus energy of the power plant in
the zone.
PREFERENTIAL POLICIES
For introducing more investors a special management administration,
mainly responsible for importing capital and "threethough and one Level" of the
site, is found. All preferential policies bestowed on the zone will be implemented to the
letter. The zone formulated more favorable detailed policies on kinds of taxation, payment
of land transferred etc, inaccordance with relevant regulation of Shanxi province and
Datong Municipal Government.
|
|